SPI Supplies

SPI-DRY™ Critical Point Dryers

Replacement of the bonded (Dowty) seals



Spanish




Replacing the seal is really very easy.

Once the CPD is vented and brought to atmosphere, it is disconnected from the gas tank (bottle in some countries) and the body of the instrument is put on its side. This should be done only on a soft kind of surface and never on a hard lab bench. We recommend a stack of layers of SPI-Wipers, lint free cotton wipers.

Next, unscrew the stem assembly using a 1" AF wrench (spanner in some countries) on the large nut that secures the stem to the CPD chamber. This may be fairly tight, so some patience might be required to get it to turn. But once it is removed, the Dowty seal will be in clear view and it can then be removed from its recessed space and the new one installed.

Then screw the stem assembly back on and tighten up all the connections.

And the CPD unit should be good as new for another hundred years of faithful operation......!


To Ask a Question or Make a Comment

To Place an Order or Request a Quote


Return to:
Monday December 01, 2008
© Copyright 1998 - 2008. By Structure Probe, Inc.
Contacting SPI Supplies and Structure Probe, Inc.
All rights reserved.
All trademarks and trade names are the property of their respective owners.
Privacy Policy

Worldwide Distributors, Representatives, and Agents Flag logo